2011
DOI: 10.1080/00207543.2010.495735
|View full text |Cite
|
Sign up to set email alerts
|

A method for the hierarchical planning of the structure, dimension and material requirements of manufacturing systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0

Year Published

2013
2013
2016
2016

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 19 publications
(21 reference statements)
0
2
0
Order By: Relevance
“…Of the 177 references addressing production planning for multiple items, 106 references correspond to final products and 71 references consider multi-level product structures. This latter group of papers corresponds not only to MRP models, but also to SCP (27 references), APP (Jayaraman, 2006;Ng, 2007a, 2007b; and HPP (Aghezzaf et al, 2011;Timm and Blecken, 2011). Table 3 summarizes the works reviewed in terms of number of products and number of levels.…”
Section: Number Of Products and Number Of Levelsmentioning
confidence: 99%
See 1 more Smart Citation
“…Of the 177 references addressing production planning for multiple items, 106 references correspond to final products and 71 references consider multi-level product structures. This latter group of papers corresponds not only to MRP models, but also to SCP (27 references), APP (Jayaraman, 2006;Ng, 2007a, 2007b; and HPP (Aghezzaf et al, 2011;Timm and Blecken, 2011). Table 3 summarizes the works reviewed in terms of number of products and number of levels.…”
Section: Number Of Products and Number Of Levelsmentioning
confidence: 99%
“…Most of these works present only overtime (23 references) or subcontracting (10 references) decisions in isolation. Moreover, the combination of overtime and subcontracting production is addressed by 10 references (Erromdhani et al, 2012;Galasso et al, 2009;Jamalnia and Soukhakian, 2009;Leung et al, 2006;Liang, 2007;Merzifonluoglu et al, 2007;Mirzapour Al-e-hashem et al, 2011;Pastor et al, 2009;Timm and Blecken, 2011;Xue et al, 2011). Mula et al (2008), Lusa et al (2009) and Peidro et al (2010) propose the simultaneous modeling of overtime and undertime decisions, while only Fandel and Stammen-Hegene (2006) consider undertime decisions in isolation.…”
Section: 6c Production Timesmentioning
confidence: 99%
“…Attainment of accuracy in raw materials mix for production process has been the major problem in many production organizations in developing countries. There were many studies on material planning for production process that dealt with single-and multi-material management [1][2][3][4][5][6][7][8][9][10][11]. Many of these studies were deficient in determining simultaneously the appropriate quantities of the materials needed for the manufacturing of a particular product.…”
Section: Introductionmentioning
confidence: 99%