2011
DOI: 10.1080/15732470802445336
|View full text |Cite
|
Sign up to set email alerts
|

A management system for road information properties

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2011
2011
2022
2022

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…At present, the digitalization of the engineering quality of various expressway construction projects mainly focuses on the preservation of traces of the quality management process, and most of the test/inspection data and production process data that play a decisive role in the quality of the engineering are only electronically archived in the test account ( Yu et al, 2018 ; Xiao et al, 2020 ). In addition, the centralized storage of monitoring data of the Internet of Things has not yet formed a scientific management system with data management at the core ( Kusano et al, 2011 ). This will lead to difficulty in information traceability, large barriers to information transmission between stages, and slow feedback on problems, resulting in low overall management efficiency ( Xu et al, 2019 ).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…At present, the digitalization of the engineering quality of various expressway construction projects mainly focuses on the preservation of traces of the quality management process, and most of the test/inspection data and production process data that play a decisive role in the quality of the engineering are only electronically archived in the test account ( Yu et al, 2018 ; Xiao et al, 2020 ). In addition, the centralized storage of monitoring data of the Internet of Things has not yet formed a scientific management system with data management at the core ( Kusano et al, 2011 ). This will lead to difficulty in information traceability, large barriers to information transmission between stages, and slow feedback on problems, resulting in low overall management efficiency ( Xu et al, 2019 ).…”
Section: Introductionmentioning
confidence: 99%
“…(2) In terms of design, traditional paper delivery is still the norm ( Kusano et al, 2011 ). There is little research into the digital delivery of design information.…”
Section: Introductionmentioning
confidence: 99%