“…Similar assignment and scheduling problems are solved in [24,61,62,118]. LBBD models having basically the same structure have been applied to steel production [49,54], concrete delivery [72], batch scheduling in chemical plants [55,83,84,117], resource scheduling with sequence-dependent setups [119], and computer processor scheduling [13,14,15,20,38,58,78,79,80,81,103,108].…”