Our system is currently under heavy load due to increased usage. We're actively working on upgrades to improve performance. Thank you for your patience.
2010
DOI: 10.1016/j.cie.2010.09.007
|View full text |Cite
|
Sign up to set email alerts
|

A linear relaxation-based heuristic approach for logistics network design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
39
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 40 publications
(39 citation statements)
references
References 27 publications
0
39
0
Order By: Relevance
“…In contrast, the models proposed by Antunes and Peeters [4], Hugo and Pistikopoulos [8], and Thanh et al [22,23] are more comprehensive. The redesign of an existing network of schools is studied in [4] through the gradual capacity expansion of new locations and the gradual capacity reduction of existing facilities.…”
Section: Multi-period Scndmentioning
confidence: 69%
See 3 more Smart Citations
“…In contrast, the models proposed by Antunes and Peeters [4], Hugo and Pistikopoulos [8], and Thanh et al [22,23] are more comprehensive. The redesign of an existing network of schools is studied in [4] through the gradual capacity expansion of new locations and the gradual capacity reduction of existing facilities.…”
Section: Multi-period Scndmentioning
confidence: 69%
“…Typically, once capacity or technology has been acquired for a location, all products handled by the new facility compete for the installed capacity. This aspect is present in the models of Elhedhli and Gzara [5], Jang et al [10], Mazzola and Neebe [12], Sadjady and Davoudpour [19], Thanh et al [22,23], and Vila et al [24]. In contrast, Hugo and Pistikopoulos [8] consider the installed production capacity to be product-dependent.…”
Section: Facility Configuration and Capacity Utilizationmentioning
confidence: 91%
See 2 more Smart Citations
“…Outsourced products are directly delivered to customers. The capacity of external facility is assumed to be infinite (Cortinhal et al, 2015;Thanh et al, 2011Thanh et al, , 2010Thanh et al, ,2008Hinojosa et al, 2008).Capacity expansion at undisrupted facilities is not permitted during disruption onset period td 1 as it is not practically feasible to implement structural changes in short term immediately after the disruption (Melo etal., 2006 andIvanov et al, 2016).…”
Section: Problem Description and Model Formulationmentioning
confidence: 99%