2019
DOI: 10.1155/2019/7509586
|View full text |Cite
|
Sign up to set email alerts
|

A Line Planning Approach for High-Speed Rail Networks with Time-Dependent Demand and Capacity Constraints

Abstract: In high-speed rail networks, trains are operated with high speeds and high frequencies, which can satisfy passenger demand with different expected departure times. Given time-dependent demand, this paper proposes a line planning approach with capacity constraints for high-speed rail networks. In this paper, a bilevel optimization model is formulated and the constraints include track section capacity per unit time, train seat capacity, and the gap between the number of starting trains and that of ending trains … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 13 publications
(4 citation statements)
references
References 18 publications
0
4
0
Order By: Relevance
“…On the corridor with various parallel transport modes, the main factors that affect the passenger choice include the speed, security, punctuality, economic, comfortable, and convenient [20], besides the purchasing power of passenger and travel purpose. HST is a closer substitute to the plane than the conventional train.…”
Section: Attractiveness Of Hstmentioning
confidence: 99%
“…On the corridor with various parallel transport modes, the main factors that affect the passenger choice include the speed, security, punctuality, economic, comfortable, and convenient [20], besides the purchasing power of passenger and travel purpose. HST is a closer substitute to the plane than the conventional train.…”
Section: Attractiveness Of Hstmentioning
confidence: 99%
“…Actually, time-dependent demand had already been studied in some passenger transportation organization optimization problems. For example, time-dependent demand was considered in the train timetable optimization by Kaspi and Raviv [3] and Niu et al [4] and also used in the line planning problem by Su et al [5]. Xu et al [6] designed passenger assignment methods for high-speed railways based on time-dependent demand.…”
Section: Literature Reviewmentioning
confidence: 99%
“…e time-dependent demand has been studied by various researchers [3][4][5][6], and a train timetable or line planning has been evaluated and optimized based on the passenger choice behaviors with different departure times. However, time-dependent demand has been underresearched in the optimal pricing studies of intercity highspeed railways.…”
Section: Introductionmentioning
confidence: 99%
“…Fu et al [12] presented a hierarchical line planning approach for China HSR network. Su et al [21] formulated a bilevel optimization model and considered the train operational cost and passenger travel cost in the upper level and passenger assignment in the lower level. Some research focused on algorithm for LPP, such as Column Generation algorithm [19], Simulated Annealing [11].…”
Section: Literature Reviewmentioning
confidence: 99%