2008
DOI: 10.1590/s0104-65002008000400002
|View full text |Cite
|
Sign up to set email alerts
|

A hybrid heuristic for the multi-plant capacitated lot sizing problem with setup carry-over

Abstract: A hybrid heuristic for the multi-plant capacitated lot sizing problem with setup carry-over Journal of the Brazilian Computer Society, v.14, n.4, p.7-15, 2008 http://producao.usp.br/handle/BDPI/11832 Downloaded from: Biblioteca Digital da Produção Intelectual -BDPI, Universidade de São PauloBiblioteca Digital da Produção Intelectual -BDPI Departamento de Matemática Aplicada e Estatística -ICMC/SME Artigos e Materiais de Revistas Científicas -ICMC/SME NP-complete. There are many approaches for the CLSP with a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2018
2018
2018
2018

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 19 publications
0
1
0
1
Order By: Relevance
“…Almada-Lobo et al (2007) present two novel mixed integer programming (MIP) formulations for the real-world CLSP with setup carryover, sequence dependent setup times and costs in the glass container industry. A GRASP meta-heuristic is proposed in Nascimento and Toledo (2008) to solve the CLSP with setup carryover in a multi-plant setting. Another extension to this problem is to permit backordering of unsatisfied demand.…”
Section: Introductionmentioning
confidence: 99%
“…Almada-Lobo et al (2007) present two novel mixed integer programming (MIP) formulations for the real-world CLSP with setup carryover, sequence dependent setup times and costs in the glass container industry. A GRASP meta-heuristic is proposed in Nascimento and Toledo (2008) to solve the CLSP with setup carryover in a multi-plant setting. Another extension to this problem is to permit backordering of unsatisfied demand.…”
Section: Introductionmentioning
confidence: 99%
“…O gapé o incremento de qualidade com relaçãoà estratégia de referência, assim, quanto maior o valor melhor o resultado. Essa medida de avaliação vem sendo utilizada em trabalhos relacionadosà otimização de problemas com complexidade de tempo polinomial ou NP que recorremà soluções heurísticas, como em [Nascimento e Toledo, 2008].…”
Section: Avaliação De Desempenho De Consultasunclassified