2021
DOI: 10.1109/access.2020.3048016
|View full text |Cite
|
Sign up to set email alerts
|

A Hybrid Hesitant 2-Tuple IVSF Decision Making Approach to Analyze PERT-Based Critical Paths of New Service Development Process for Renewable Energy Investment Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
9
0
2

Year Published

2021
2021
2022
2022

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 39 publications
(12 citation statements)
references
References 89 publications
1
9
0
2
Order By: Relevance
“…No single work referring to critical path in the context of Z-fuzzy numbers has been identified. On the other hand, papers referring to critical path methods for fuzzy durations modeled not only by well-known types of fuzzy numbers, but also by less common types, like hexagonal, octagonal, type-2, hesitant, intuitionistic fuzzy numbers [5][6][7][8][9][10][11][12][13][14][15] have been identified, which means that our research fits well into the current trends of research in fuzzy project modelling.…”
Section: Related Literaturesupporting
confidence: 67%
“…No single work referring to critical path in the context of Z-fuzzy numbers has been identified. On the other hand, papers referring to critical path methods for fuzzy durations modeled not only by well-known types of fuzzy numbers, but also by less common types, like hexagonal, octagonal, type-2, hesitant, intuitionistic fuzzy numbers [5][6][7][8][9][10][11][12][13][14][15] have been identified, which means that our research fits well into the current trends of research in fuzzy project modelling.…”
Section: Related Literaturesupporting
confidence: 67%
“…In some other models, the causal impacts of the items could not be evaluated (Rahiminezhad Galankashi et al 2020;Bottani et al 2018). In addition, considering the distances to both positive and negative optimal results in the analysis process is the reason for using the TOPSIS in the analysis process (Cheng et al 2020;Haiyun et al 2021). Other models only consider the distance to the positive optimal solutions (Suganthi 2018;Bathaei et al 2019).…”
Section: Discussionmentioning
confidence: 99%
“…( 45) identifies picture fuzzy rough numbers (Jin et al 2021) 46) computes normalized values (Zhan et al 2020a, b), and a weighted normalized DMT is generated with Eq. ( 47) (Cheng et al 2020). Equations ( 48)-( 53) define the distance between the best and worst alternatives.…”
Section: Topsis and Vikor Based On Pfrssmentioning
confidence: 99%
“…PVs, FCs and batteries are always disturbed by nature factors such as variation output load, grid-side faults and changes of irradiation and temperature. The designing of strong control systems to kept output voltage and power in a desired level is one of the challenging problems [1]- [4].…”
Section: Introductionmentioning
confidence: 99%