2017
DOI: 10.1504/ijaip.2017.082971
|View full text |Cite
|
Sign up to set email alerts
|

A hybrid fruit fly optimisation algorithm to solve the flow shop scheduling problems with multi-objectives

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Through the abovementioned literature, it can be found that in solving the green and sustainable scheduling problem, existing contributions focus on how to transform multi-objective optimization into single-objective optimization [24][25][26], ignoring the balance of multi-objectives. In addition, these consider the delivery time window [27] without using it as a constraint.…”
Section: Introductionmentioning
confidence: 99%
“…Through the abovementioned literature, it can be found that in solving the green and sustainable scheduling problem, existing contributions focus on how to transform multi-objective optimization into single-objective optimization [24][25][26], ignoring the balance of multi-objectives. In addition, these consider the delivery time window [27] without using it as a constraint.…”
Section: Introductionmentioning
confidence: 99%