2021 IEEE High Performance Extreme Computing Conference (HPEC) 2021
DOI: 10.1109/hpec49654.2021.9622872
|View full text |Cite
|
Sign up to set email alerts
|

A High-Performance Heterogeneous Critical Path Analysis Framework

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 14 publications
0
1
0
Order By: Relevance
“…For heterogeneous parallelism, balancing the workload between the CPU and GPU with different arithmetic capabilities for efficient computing is critical [69,70]. There are three main methods to evaluate the best workload balancing ratio α: the enumeration method, the formula method, and the pre-run method [71,72].…”
Section: Dynamic Workload Balancingmentioning
confidence: 99%
“…For heterogeneous parallelism, balancing the workload between the CPU and GPU with different arithmetic capabilities for efficient computing is critical [69,70]. There are three main methods to evaluate the best workload balancing ratio α: the enumeration method, the formula method, and the pre-run method [71,72].…”
Section: Dynamic Workload Balancingmentioning
confidence: 99%
“…We use the opensource tool, OpenTimer, to generate 1024 different timing reports for a large circuit, netcard, of 1.5M gates [23], [24]. The correlation layer implements a CPU-based algorithm to extract graph information (critical paths [27], [28], CPPR [29], [30], [31]) and a GPU-based algorithm to perform logistic regression with gradient descent. Part of CPU and GPU tasks are dependent to each other.…”
Section: A Vlsi Timing Analysismentioning
confidence: 99%