2006
DOI: 10.1007/11779568_81
|View full text |Cite
|
Sign up to set email alerts
|

A Heuristic Load Balancing Scheduling Method for Dedicated Machine Constraint

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2006
2006
2018
2018

Publication Types

Select...
4
2

Relationship

3
3

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 15 publications
0
3
0
Order By: Relevance
“…The FSS uses the Resource Schedule and Execution Matrix (RSEM) [4,5,6,7,8,9] to manipulate the scheduling process. The fuzzy scheduling model is presented in this Section…”
Section: Fuzzy Scheduling Systemmentioning
confidence: 99%
“…The FSS uses the Resource Schedule and Execution Matrix (RSEM) [4,5,6,7,8,9] to manipulate the scheduling process. The fuzzy scheduling model is presented in this Section…”
Section: Fuzzy Scheduling Systemmentioning
confidence: 99%
“…We have proposed the heuristic Load Balancing (LB) scheduling (Shr et al, 2006a) (Shr et al, 2006b) (Shr et al, 2006c) and Multiagent Scheduling System (MSS) (Shr, et al 2006d) approaches to provide solutions to the issue of dedicated photolithography machine constraint. The dedicated photolithography machine constraint, which is caused by the natural bias of the photolithography machine, is a new challenge in the semiconductor manufacturing systems.…”
Section: Introductionmentioning
confidence: 99%
“…In this paper, motivated by the issue described above, we propose a Load Balancing (LB) scheduling approach based on the Resource Schedule and Execution Matrix (RSEM) developed in our previous research work (Shr, 2006a) (Shr, 2006b) (Shr, 2006c) to tackle the dedicated machine constraint and load balancing issue.…”
Section: Introductionmentioning
confidence: 99%