2018 21st Euromicro Conference on Digital System Design (DSD) 2018
DOI: 10.1109/dsd.2018.00065
|View full text |Cite
|
Sign up to set email alerts
|

A Heuristic for Variable Re-Entrant Scheduling Problems

Abstract: DOI to the publisher's website.• The final author version and the galley proof are versions of the publication after peer review.• The final published version features the final layout of the paper including the volume, issue and page numbers. Link to publication General rightsCopyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal re… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 13 publications
(29 reference statements)
0
2
0
Order By: Relevance
“…Our heuristic approach is based on extending list schedulers to integrate maintenance activities in the schedule. Heuristic list schedulers have been developed for the industrial problem we consider [38]- [40] and are also suitable for online scheduling. Thus, we look into extending them to handle integrated production and maintenance scheduling.…”
Section: Heuristic Solution Approachmentioning
confidence: 99%
See 1 more Smart Citation
“…Our heuristic approach is based on extending list schedulers to integrate maintenance activities in the schedule. Heuristic list schedulers have been developed for the industrial problem we consider [38]- [40] and are also suitable for online scheduling. Thus, we look into extending them to handle integrated production and maintenance scheduling.…”
Section: Heuristic Solution Approachmentioning
confidence: 99%
“…Thus, we look into extending them to handle integrated production and maintenance scheduling. The typical flow of a list scheduler is to order operations according to some metric and insert them in a schedule one after the other until all operations are scheduled [40].…”
Section: Heuristic Solution Approachmentioning
confidence: 99%