2016
DOI: 10.15240/tul/001/2016-1-004
|View full text |Cite
|
Sign up to set email alerts
|

A grey multi-objective linear model to find critical path of a project by using time, cost, quality and risk parameters

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
5
2
1

Relationship

1
7

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 26 publications
(14 reference statements)
0
5
0
Order By: Relevance
“…To access a unique ranking for the criteria, interval ranking methods could be applied, for which interval numbers, interval arithmetic and interval numbers comparison method are to be introduced firstly. Considering the interval number A = [ a l , a R ] = ( x : a l ≤ x ≤ a R , x ∈ R ), where, a l and a R are the left limits and the right limit of A, respectively, the operations on closed intervals are defined as equations (8)–(12) (Rezaei, 2015, 2016; Mahdiraji et al , 2016, 2011; Hajiagha et al , 2015a; Beheshti et al , 2016; Hajiagha et al , 2015b): …”
Section: Basic Conceptsmentioning
confidence: 99%
“…To access a unique ranking for the criteria, interval ranking methods could be applied, for which interval numbers, interval arithmetic and interval numbers comparison method are to be introduced firstly. Considering the interval number A = [ a l , a R ] = ( x : a l ≤ x ≤ a R , x ∈ R ), where, a l and a R are the left limits and the right limit of A, respectively, the operations on closed intervals are defined as equations (8)–(12) (Rezaei, 2015, 2016; Mahdiraji et al , 2016, 2011; Hajiagha et al , 2015a; Beheshti et al , 2016; Hajiagha et al , 2015b): …”
Section: Basic Conceptsmentioning
confidence: 99%
“…Several authors have applied modeling techniques such as fuzzy logic (Amiri and Golozari, 2011; Cristobol, 2013); grey numbers (Razavi et al, 2015;Mahdiraji et al, 2016); and genetic algorithms (Hosseini et al, 2018) to address this problem when quality follows a linear scale. Salmasnia et al (2016) use a response surface methodology to find an optimal amount of resources to assign to activities so that project total time and cost are minimized while quality characteristics are maximized.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Fuzzy sets introduced by (Zadeh, 1965) is an efficient and accurate tool in uncertain circumstances (Zimmermann, 1978). Scholars have employed it in many cases (Mahdiraji et al, 2016;Razavi et al, 2015;Razavi et al, 2013). A complete review of Fuzzy sets and its applications can be found in (Buckley & Eslami, 2002;Masulli et al, 2007;Wang, 1983); however, a review of basic sets is briefed in the rest of this section.…”
Section: Fuzzy Set Theory Preliminariesmentioning
confidence: 99%