2022
DOI: 10.1186/s00015-022-00422-z
|View full text |Cite
|
Sign up to set email alerts
|

A gravimetric assessment of the Gotthard Base Tunnel geological model: insights from a novel gravity terrain-adaptation correction and rock physics data

Abstract: The Gotthard Base Tunnel (GBT) is a 57 km long railway tunnel, constructed in the Central Alps in Switzerland and extending mainly North–South across numerous geological units. We acquired 80 new gravity data points at the surface along the GBT profile and used 77 gravity measurements in the tunnel to test and constrain the shallow crustal, km-scale geological model established during the tunnel construction. To this end, we developed a novel processing scheme, which computes a fully 3D, density-dependent grav… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 23 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?