2014
DOI: 10.1016/j.apm.2013.08.023
|View full text |Cite
|
Sign up to set email alerts
|

A genetic algorithm for optimizing defective goods supply chain costs using JIT logistics and each-cycle lengths

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0
2

Year Published

2014
2014
2021
2021

Publication Types

Select...
8
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 27 publications
(15 citation statements)
references
References 28 publications
0
13
0
2
Order By: Relevance
“…The findings illustrated the effectiveness of this approach, which improve the performance and minimise the production cost within the organisation (Wong et al, 2006). Ghasimi et al (2014) introduced a novel mathematical model for three-echelon Defective Goods Supply Chain Network (DGSCN) was built to ascertain the Economic Production Quantity (EPQ) and lead time, additionally reducing all production, distribution and holding cost using JIT logistics. GA and Cplex solver were used to optimise their defective goods supply chain network model.…”
Section: An Overview Of Jit Optimisation Using Gamentioning
confidence: 99%
“…The findings illustrated the effectiveness of this approach, which improve the performance and minimise the production cost within the organisation (Wong et al, 2006). Ghasimi et al (2014) introduced a novel mathematical model for three-echelon Defective Goods Supply Chain Network (DGSCN) was built to ascertain the Economic Production Quantity (EPQ) and lead time, additionally reducing all production, distribution and holding cost using JIT logistics. GA and Cplex solver were used to optimise their defective goods supply chain network model.…”
Section: An Overview Of Jit Optimisation Using Gamentioning
confidence: 99%
“…GA was combined with particle swarm optimization (PSO) for optimizing a mathematical model with a JIT system for a defective goods supply chain network [26]. Researchers proposed GA for optimizing a novel mathematical model of the defective goods supply chain network [27]. The dynamic vehicle routing problem (DVRP) and stochastic dynamic travelling salesman problem with hard time window (SDTSPTW) [11] is a core optimization task of just-in-time supply solutions.…”
Section: Content Analysismentioning
confidence: 99%
“…En [23] se aborda el problema de programación de tareas que pueden ser realizadas por una máquina para la fabricación de productos y en el que se debe determinar la secuencia de las tareas y también la formación de lotes de producción. En [24] se proponen AG's para reducir al mínimo los costos de producción, distribución, explotación y pedido para los productos de menor calidad en un proceso de fabricación. En el modelo propuesto se asumió que estos productos no son reparables y se venden directamente a los clientes a un precio menor.…”
Section: Procesos Scor Y Algoritmos Genéticosunclassified