A Generic Storage Model Based on a Future Cost Piecewise-Linear Approximation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
13
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 15 publications
(13 citation statements)
references
References 19 publications
0
13
0
Order By: Relevance
“…Losses materialise because of the self-discharge of the ESS over time. When modelling the ESS short-term operation, such as participation in the day-ahead or intraday markets, this term is often ignored [16,17], but it is taken into account in the long-term models [18].…”
Section: Energy Storage System Modelsmentioning
confidence: 99%
See 2 more Smart Citations
“…Losses materialise because of the self-discharge of the ESS over time. When modelling the ESS short-term operation, such as participation in the day-ahead or intraday markets, this term is often ignored [16,17], but it is taken into account in the long-term models [18].…”
Section: Energy Storage System Modelsmentioning
confidence: 99%
“…Pandžić et al [66] analysed the influence of the optimisation period on profits of an ESS operator and concluded that it is best for a virtual storage plant to optimise operation over the scheduling horizon of at least two days. Alvarez et al [18] used the future cost function to model the influence of ESS' long-term strategy on its short-term operation. They showed that fixing the ESS' state of energy to the previously scheduled long-term amounts increases operational costs and therefore decreases profit of the virtual power plant (VPP).…”
Section: Self-schedulingmentioning
confidence: 99%
See 1 more Smart Citation
“…Alvarez et al [29] proposed a general purpose ESS model inspired by the behavior of hydraulic reservoirs. Using the results obtained from stochastic dual DP, carried out to determine the long-term energy schedule, the linear model of ESS cost is derived.…”
Section: Literature Reviewmentioning
confidence: 99%
“…where each element g (i,t,k) is an integer between −1 and +1, depending on the time (t) and NL value (P N(t) ). Similarly, the population or group of agents of the optimization algorithm for iteration k can be expressed as a matrix according to (29):…”
Section: Problem Formulationmentioning
confidence: 99%