1999
DOI: 10.1016/s0278-6125(00)87641-4
|View full text |Cite
|
Sign up to set email alerts
|

A generative approach for concurrent manufacturability evaluation and subcontractor selection

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
16
0

Year Published

2001
2001
2011
2011

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 27 publications
(17 citation statements)
references
References 17 publications
1
16
0
Order By: Relevance
“…In addition to the integrated components, MWMs may carry hybrid components, which are assembled separately using techniques such as soldering, wire bonding, and ultrasonic bonding. More details about this domain can be found in Minis et al [12]. Mounting these components often requires holes, pockets, and other features in the substrate.…”
Section: Microwave Modulesmentioning
confidence: 99%
“…In addition to the integrated components, MWMs may carry hybrid components, which are assembled separately using techniques such as soldering, wire bonding, and ultrasonic bonding. More details about this domain can be found in Minis et al [12]. Mounting these components often requires holes, pockets, and other features in the substrate.…”
Section: Microwave Modulesmentioning
confidence: 99%
“…The generative approach [17,28], however, creates a set of feasible partner-specific process plans for the given product design and calculates the throughput time at each step in each plan. Given a production quantity, the approach calculates the required processing time for an order of that size and adds the processing time to historical averages for the setup and queue times at that resource in that manufacturing facility.…”
Section: Estimating Throughput Timementioning
confidence: 99%
“…Estimating the processing time of a manufacturing step given a detailed design is usually different from estimating the processing time given a conceptual design. For a detailed design, highly detailed process planning, manufacturing process simulation, or time estimation models can be employed [17,28]. For a conceptual design, however, less detailed models must depend upon a more limited set of critical design information [11].…”
Section: Manufacturing System Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…This example uses data that our collaborators were able to provide and other synthetic data that we created. For details about the process planning and processing time estimation, see [17,28].…”
Section: Examplementioning
confidence: 99%