1979
DOI: 10.1109/tpas.1979.319510
|View full text |Cite
|
Sign up to set email alerts
|

A Generation Reallocation and Load Shedding Algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
10
0

Year Published

1983
1983
2016
2016

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 74 publications
(10 citation statements)
references
References 4 publications
0
10
0
Order By: Relevance
“…The performance of the decoupled security enhancement algorithm (DSEA) has been compared with two other methods based on nonlinear programming (NLP) [7] and linear programming (LP) [11], respectively, in terms of execution times and storage requirements. Three tests were done on the 24-busbar IEEE reliability network [17] (see Fig.…”
Section: Comparison Of Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The performance of the decoupled security enhancement algorithm (DSEA) has been compared with two other methods based on nonlinear programming (NLP) [7] and linear programming (LP) [11], respectively, in terms of execution times and storage requirements. Three tests were done on the 24-busbar IEEE reliability network [17] (see Fig.…”
Section: Comparison Of Methodsmentioning
confidence: 99%
“…This assumption holds depending on the degree of accuracy required, the time available for the calculations in power-system control centres and the magnitude of impedance change with angle for particular phase shifters. The variations of impedance change with angular settings must be taken into account for emergency conditions, because of the wide range of angles Initial overload in line [11][12][13][14] Step (ii)…”
Section: Static Security Control Via Phase Shiftersmentioning
confidence: 99%
“…A policy of load shedding in power systems has been discussed by Hajdue (1968). Medicheria (1979Medicheria ( , 1981 and Chan (1979) proposed generation rescheduling or reallocation and load shedding to alleviate line overloads. Application of under-frequency relays for automatic load shedding has been studied by Lokay.…”
Section: Introductionmentioning
confidence: 99%
“…1983]. Piecewise-linear objective functions are used for linear progranuning in the two papers coauthored by Chan [Chan ~ Schweppe 1979, Chan & Yip 1979.…”
mentioning
confidence: 99%
“…"':l load shedding is performed using linear or piecewise-linear [Chan & Schweppe 1979, Krogh et.al 1983 and quadratic [Hajdu et.al. 1968, Palaniswaoy et.al.…”
mentioning
confidence: 99%