2012 IEEE Power and Energy Society General Meeting 2012
DOI: 10.1109/pesgm.2012.6345491
|View full text |Cite
|
Sign up to set email alerts
|

A general formulation for LMP evaluation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
24
0

Year Published

2013
2013
2021
2021

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 24 publications
(25 citation statements)
references
References 0 publications
1
24
0
Order By: Relevance
“…Marginal are the generators which are dispatched neither at their minimum nor at their maximum limit. In [2], similar results are obtained for the general case, namely that the nodal prices are a function of the marginal generators costs and the network constraints, including the losses.…”
Section: Description Of the Approachsupporting
confidence: 57%
“…Marginal are the generators which are dispatched neither at their minimum nor at their maximum limit. In [2], similar results are obtained for the general case, namely that the nodal prices are a function of the marginal generators costs and the network constraints, including the losses.…”
Section: Description Of the Approachsupporting
confidence: 57%
“…OPF is the integration of power flow calculation and minimization of economic objective function subject to the equality and inequality constraints. As known, power injected into all nodes is equal to power withdrawn plus transmission losses which can be written as [2]: (8) Where: is the transmission losses in the power system is the sum real power generated from node i is the sum real power demand at node i Based on the equation (8), the the corresponding Lagrangian equation can be defined as follows [15]: (9) Where:…”
Section: B Locational Marginal Pricementioning
confidence: 99%
“…On the other hand, congestion arising anywhere on a transmission grid necessarily results in the separation of LMPs at two or more bus locations [27]. Moreover, the day-ahead energy purchases of each LSE and the dayahead energy sales of each GenCo are settled each hour in accordance with the LMP determined at its own particular bus location.…”
Section: B Total Net Surplus and Market Efficiencymentioning
confidence: 99%