A Fuzzy Multi-Criteria SWOT Analysis: An Application to Nuclear Power Plant Site Selection

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
25
0
1

Year Published

2016
2016
2020
2020

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 35 publications
(26 citation statements)
references
References 40 publications
0
25
0
1
Order By: Relevance
“…As a result, the charging station should be located an area away from the heavy load lines to ensure the secure operation of the distribution network. (3) Availability of resources (C23) [54,70,71,73,75,77,78,80]: A site which has good availability of construction water and power should be given priority for the purpose of allowing a fast construction schedule.…”
Section: Engineering Feasibilitymentioning
confidence: 99%
See 4 more Smart Citations
“…As a result, the charging station should be located an area away from the heavy load lines to ensure the secure operation of the distribution network. (3) Availability of resources (C23) [54,70,71,73,75,77,78,80]: A site which has good availability of construction water and power should be given priority for the purpose of allowing a fast construction schedule.…”
Section: Engineering Feasibilitymentioning
confidence: 99%
“…(1) Convenience of transportation (C31) [34,50,54,[71][72][73][76][77][78][80][81][82][83]: The parameter which contains the condition of main road, the number of lanes and the number of intersections near the charging station, is critical to the realization of high profit and convenience. (2) Service capability (C32) [71,73,76,81]: It is defined as the daily service volume as well as the maximum number of EV that could get access to the charging service provided by the charging station.…”
Section: Service Availabilitymentioning
confidence: 99%
See 3 more Smart Citations