2012
DOI: 10.1134/s1062739148030173
|View full text |Cite
|
Sign up to set email alerts
|

A fuzzy method for selecting underground coal mining method considering mechanization criteria

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0
1

Year Published

2016
2016
2023
2023

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 21 publications
(6 citation statements)
references
References 3 publications
0
5
0
1
Order By: Relevance
“…In recent years, as the one-time fully mechanized mining technology with large mining height gains momentum, the hydraulic support is also developing towards larger mining height. In the scheme of one-time full height mining with large mining height, the hydraulic support equipment is gradually developing to a larger size due to the large mining height [1][2][3]. According to the actual use of the hydraulic support with large mining height, it turns out to be a necessity for making a targeted analysis on the adaptability of its support and face guard.…”
Section: Introductionmentioning
confidence: 99%
“…In recent years, as the one-time fully mechanized mining technology with large mining height gains momentum, the hydraulic support is also developing towards larger mining height. In the scheme of one-time full height mining with large mining height, the hydraulic support equipment is gradually developing to a larger size due to the large mining height [1][2][3]. According to the actual use of the hydraulic support with large mining height, it turns out to be a necessity for making a targeted analysis on the adaptability of its support and face guard.…”
Section: Introductionmentioning
confidence: 99%
“…Per steps f and g, Tables 10 and 11 show the ultimate scores of the five alternatives in the form of fuzzy numbers, obtained by adding the fuzzy numbers-elements of the fuzzy performance matrix, according to Equation (11). Then the ultimate weights of the alternatives are shown in the form of non-fuzzy numbers, after defuzzification employing Equation (12). The final ranking of the alternatives is based on the sensitivity analysis per Equation (13).…”
Section: Resultsmentioning
confidence: 99%
“…Bulanık önceliklendirme metodu Mikhailov ve Tsvetinov tarafından geliştirilmiştir ve alternatif hizmet sağlayıcıların değerlendirilmesinde [24], yeraltı mekanizasyon yöntemlerinin madende uygulanıp uygulanamayacağının değerlendirilmesinde [25], maden ocağında oluşabilecek tehlike ve riskleri önlemek amacıyla gerçekleştirilen FMEA (hata türleri ve etkileri analizi) çalışmasında [23], üniversite hastanesinde görev yapan hekimler üzerinde algılanan zihinsel iş yüklerinin değerlendirilebilmesinde [15] kullanılmıştır.…”
Section: Bulanık öNceliklendirme Metodu (Böm)unclassified