“…From Table 3, it can be observed that initial voltage of busses 16,17,18,19,20,21,22,23,24,25,26,27,46,47,48,49,50,51,52,53, and 54 is below the lower limit. The SCBs of 1500kVAR, 500kVAR, and 500kVAR are installed at bus 52, bus 49, and bus 50, respectively.…”