2023
DOI: 10.1061/jbenf2.beeng-6154
|View full text |Cite
|
Sign up to set email alerts
|

A Fully Precast Pier System for Accelerated Bridge Construction in Seismic Regions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 12 publications
0
1
0
Order By: Relevance
“…Their approach uses a new precast method involving structural steel tubes filled with concrete in plastic hinge zones, which act as seismic energy dissipating devices to enhance the structural performance of piers. Another innovative approach to reduce risks and improve construction efficiency includes the development of systems such as the Auto-Climbing Form System (ACS), which automatically raises formwork, and the Slip Form System, which allows continuous concrete pouring while gradually lifting the formwork [11,13].…”
Section: Multi-robot System For Pier Constructionmentioning
confidence: 99%
“…Their approach uses a new precast method involving structural steel tubes filled with concrete in plastic hinge zones, which act as seismic energy dissipating devices to enhance the structural performance of piers. Another innovative approach to reduce risks and improve construction efficiency includes the development of systems such as the Auto-Climbing Form System (ACS), which automatically raises formwork, and the Slip Form System, which allows continuous concrete pouring while gradually lifting the formwork [11,13].…”
Section: Multi-robot System For Pier Constructionmentioning
confidence: 99%