2006 International Conference on Parallel Processing (ICPP'06)
DOI: 10.1109/icpp.2006.8
|View full text |Cite
|
Sign up to set email alerts
|

A Framework to Achieve Guaranteed QoS for Applications and High System Performance in Multi-Institutional Grid Computing

Abstract: Providing QoS guarantees to the applications in a multi-institutional

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(11 citation statements)
references
References 10 publications
0
11
0
Order By: Relevance
“…The flexible resource co-allocation (FlexCo) model proposed here is inspired by existing work on flexible advance reservations [12,16,20,21,24,25]. A request, or a multisite job, following this model can have relaxed start and completion times, and the flexibility to define the number of processors used in each machine.…”
Section: Flexible Resource Co-allocation Modelmentioning
confidence: 99%
See 2 more Smart Citations
“…The flexible resource co-allocation (FlexCo) model proposed here is inspired by existing work on flexible advance reservations [12,16,20,21,24,25]. A request, or a multisite job, following this model can have relaxed start and completion times, and the flexibility to define the number of processors used in each machine.…”
Section: Flexible Resource Co-allocation Modelmentioning
confidence: 99%
“…The local schedulers use Algorithm 1 to reschedule jobs whenever a job completes before its estimated time. The rescheduling is based on the compressing method described by Weil and Feitelson [31], which consists in bringing the jobs to the current time according to their estimated start times, not their arrival times (Lines 3-5, [11][12][13][14]. This avoids the violation of the completion time of jobs given by the original schedule.…”
Section: Reschedulingmentioning
confidence: 99%
See 1 more Smart Citation
“…It can be calculated as the ratio of the sum of the work of all the rejected ARs and the sum of the total work of all ARs [14] Utilization (U): resource utilization is the fraction of the total time the resource is consumed by executing jobs or accepted ARs. It is calculated as equation (3).…”
Section: Percentage Of Work Rejected (Wr)mentioning
confidence: 99%
“…Advance Reservation with flexible time interval is used in some works for the purpose of enhancing utilization [10,12,13,14]. In flexible AR, in contrast to rigid, start time is not fixed and could be varied in a time interval.…”
Section: Introductionmentioning
confidence: 99%