A Framework of Selecting Building Flooring Finishing Materials by Using Building Information Modeling (BIM)

Abstract: Building materials selection is a critical process affected by many complicated factors. Due to the specific function of elements, alternatives to materials must be appropriately chosen as they differ in quality, performance, and cost. Implementing a Value Engineering (VE) process is challenging as it requires effort and several workshops. Thus, this study proposes a framework to automate the VE process of selecting building flooring material. The framework identified selected agreed criteria of flooring finis… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(8 citation statements)
references
References 58 publications
(66 reference statements)
0
1
0
Order By: Relevance
“…At frst, it is advisable to carry out a reasonable test analysis of the road bridge structure, including the coordinate points of the bridge structure, bridge pile deviation, bracket deviation, centerline deviation, etc. Te corresponding regulatory work should be carried out according to the test results [16,17]. However, in the specifc measurement and testing of bridges, most of the supervisors choose the traditional measurement method, and the relevant measuring machines and equipment, such as RTK, commonly used in the traditional type of measurement method are easily restricted by various natural environmental conditions around.…”
Section: Measurement and Inspection Of Bridge Structurementioning
confidence: 99%
“…At frst, it is advisable to carry out a reasonable test analysis of the road bridge structure, including the coordinate points of the bridge structure, bridge pile deviation, bracket deviation, centerline deviation, etc. Te corresponding regulatory work should be carried out according to the test results [16,17]. However, in the specifc measurement and testing of bridges, most of the supervisors choose the traditional measurement method, and the relevant measuring machines and equipment, such as RTK, commonly used in the traditional type of measurement method are easily restricted by various natural environmental conditions around.…”
Section: Measurement and Inspection Of Bridge Structurementioning
confidence: 99%
“…Moreover, finishing can be affected by buckling, delamination, cracking, corrosion, deferent consistency of surfaces and cleanability. Using sustainable material in finishing could improve the indoor environment, occupants' health and their satisfaction level (Nititerapad and Tongthong, 2022; Al Orabi and Al-Gahtani, 2022; Gong, 2022). Furnishing, Fittings and Equipment: furniture has an impact on occupants' comfort, flexibility and productivity.…”
Section: Literature Reviewmentioning
confidence: 99%
“…It is a systematic approach to analyzing the functionality of projects and providing key performance at the lowest total cost by removing unnecessary costs [8]. VE is applied in various investment projects and physical or moral products, as well as policies for companies and institutions to ensure that the required quality is maintained at the lowest possible costs [9]. This research is an attempt to answer several important questions.…”
Section: Literature Reviewmentioning
confidence: 99%
“…It is a tool to improve quality, increase reliability, availability, and customer satisfaction [3]. The research objective is to raise the efficiency of the finishing floors material of the largest drawing halls on the third floor (DHN 8,9,10,11) in the annex building Modern Academy of Engineering and Technology in Maadi, by measuring the value of each finishing floor alternative for the case study by using value engineering job plan which consists of 5 phases [4]: Informative & Function Analysis Phase, Speculative (Creative) Phase, Evaluation Phase, development phase, and final report phase. The life cycle cost analysis technique aims to cover all the building's future costs over its lifetime [5].…”
Section: Introductionmentioning
confidence: 99%