“…The PEC mirror phase corrector is essential to shape the input beam from the QO mode converter (launcher) into the desired Fundamental Gaussian Beam (FGB) in the sub-THz highpower gyrotron [1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20]. Figure 1 shows the diagram of such beam-shaping mirror system, in which the 4 pieces of PEC mirrors (M 1 , M 2 , M 3 and M 4 ) serve as the phase correctors, aiming at shaping the input beam from the QO launcher into the desired FGB output beam.…”