2019
DOI: 10.3390/s19214688
|View full text |Cite
|
Sign up to set email alerts
|

A Fog Computing Enabled Virtual Power Plant Model for Delivery of Frequency Restoration Reserve Services

Abstract: Nowadays, centralized energy grid systems are transitioning towards more decentralized systems driven by the need for efficient local integration of new deployed small scale renewable energy sources. The high limits for accessing the energy markets and also for the delivery of ancillary services act as a barrier for small scale prosumers participation forcing the implementation of new cooperative business models at the local level. This paper is proposing a fog computing infrastructure for the local management… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
11
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 20 publications
(11 citation statements)
references
References 41 publications
0
11
0
Order By: Relevance
“…In our experiments, we have considered a set of small prosumers, their energy production profiles being taken from [46] which contains 4 years of data with a 15-minute sampling rate. The price per energy unit of energy requested by prosumers to join the VPPs is randomly generated in a 1-10 range of values.…”
Section: Results and Analysismentioning
confidence: 99%
See 2 more Smart Citations
“…In our experiments, we have considered a set of small prosumers, their energy production profiles being taken from [46] which contains 4 years of data with a 15-minute sampling rate. The price per energy unit of energy requested by prosumers to join the VPPs is randomly generated in a 1-10 range of values.…”
Section: Results and Analysismentioning
confidence: 99%
“…We have run scenarios with different hierarchical structures using the energy profiles of prosumers from [46]. We have varied several parameters like the number of layers in the hierarchy and the maximum number of members in a VPP.…”
Section: Results and Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…This will allow for automatic and decentralized assignment of new sites / assets to an outbound service based on the asset's particularities such as response time, sync times and maximum dispatch period (i.e. offering power factor regulation [24]).…”
Section: Community Oriented Vpp Managementmentioning
confidence: 99%
“…This growing deployment of small prosumers also poses a problem in the grid systems which also needs to adopt a decentralised approach to reduce the complexity and overcome the increasingly new challenges in management (Pop et al, 2019 ). These deployments pose a different set of problems in the form of efficiency in integration, energy supply security, continuity.…”
Section: Introductionmentioning
confidence: 99%