“…The work of Kubzin & Strusevich (2005) , Kubzin & Strusevich (2006) , Cheng, Ying, Chen, & Lin (2018) , Huang & Yu (2016) , Rudek & Rudek (2012) , Seif, Yu, & Rahmanniyay (2018) , Assia, El Abbassi, El Barkany, Darcherif, & El Biyaali (2020) and Gara-Ali & Espinouse (2015) study the scheduling of production with an RMA. Kubzin & Strusevich (2005) , Kubzin & Strusevich (2006) , Cheng et al (2018) and Huang & Yu (2016) consider a maintenance activity, the duration of which is deteriorating, while Rudek & Rudek (2012) , Seif et al (2018) and Assia et al (2020) examine the case where job processing times are deteriorating. Gara-Ali & Espinouse (2015) consider both deteriorating processing times and maintenance durations.…”