A Fault Diagnosis Method Considering Meteorological Factors for Transmission Networks Based on P Systems

Abstract: Bad meteorological conditions may reduce the reliability of power communication equipment, which can increase the distortion possibility of fault information in the communication process, hence raising its uncertainty and incompleteness. To address the issue, this paper proposes a fault diagnosis method for transmission networks considering meteorological factors. Firstly, a spiking neural P system considering a meteorological living environment and its matrix reasoning algorithm are designed. Secondly, based … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 41 publications
(18 citation statements)
references
References 25 publications
0
14
0
Order By: Relevance
“…To determine the optimal location and capacity, one SVC and TCSC are installed, which are considered as a sequence with three cells for the optimization problem, where the first two cells represent the location (SVC bus number and line number for the TCSC) and the third cell represents capacity. According to the generator bus model for the SVC, its optimal reactive capacity is calculated using the power flow [18][19][20][21][22][23][24][25][26][27][28][29][30][31][32][33][34]. The capacitance range of the SCV is between −50 to 50 MVAr.…”
Section: Simulation Resultsmentioning
confidence: 99%
“…To determine the optimal location and capacity, one SVC and TCSC are installed, which are considered as a sequence with three cells for the optimization problem, where the first two cells represent the location (SVC bus number and line number for the TCSC) and the third cell represents capacity. According to the generator bus model for the SVC, its optimal reactive capacity is calculated using the power flow [18][19][20][21][22][23][24][25][26][27][28][29][30][31][32][33][34]. The capacitance range of the SCV is between −50 to 50 MVAr.…”
Section: Simulation Resultsmentioning
confidence: 99%
“…International borderless streams and organizations, particularly within a country-society sector, fundamentally complement-if not sometimes replace-the potential of high limits and set groupings. Carbon markets make use of this idea of streams and organizations as a foundation for mitigating climate change (Chen et al, 2021).…”
Section: Review Of Literaturementioning
confidence: 99%
“…Other auxiliary relations are also included to determine the cost balance relations concurrently. Cost balance has been expressed as [102][103][104][105]…”
Section: Exergoeconomic Analysismentioning
confidence: 99%
“…Consequently, optimal non-prevail solutions are collected in a Pareto frontier to impersonate a curve containing optimal spots. The most powerful decision parameters are picked as the optimization input [105][106][107][108]. Optimization may be carried by employing different algorithms.…”
Section: Multi-objective Optimizationmentioning
confidence: 99%
See 1 more Smart Citation