A Dynamic Scheduling Method for Carrier Aircraft Support Operation under Uncertain Conditions Based on Rolling Horizon Strategy

Abstract: The efficient scheduling of carrier aircraft support operations in the flight deck is important for battle performances. The supporting operations and maintenance processes involve multiple support resources, complex scheduling process, and multiple constraints; the efficient coordination of these processes can be considered a multi-resource constrained multi-project scheduling problem (MRCMPSP), which is a complex non-deterministic polynomial-time hard (NP-hard) problem. The renewable resources include the op… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 17 publications
(9 citation statements)
references
References 38 publications
0
7
0
Order By: Relevance
“…However when our optimization models are applied in real-world practice, it may not be possible to obtain the exact data on the number of animals entering and leaving shelters. In reality, such optimization models are solved repeatedly every day by shifting the planning horizon, which is called a rolling horizon approach [19][20][21]. Therefore, it is acceptable to use predicted values for input data.…”
Section: Discussionmentioning
confidence: 99%
“…However when our optimization models are applied in real-world practice, it may not be possible to obtain the exact data on the number of animals entering and leaving shelters. In reality, such optimization models are solved repeatedly every day by shifting the planning horizon, which is called a rolling horizon approach [19][20][21]. Therefore, it is acceptable to use predicted values for input data.…”
Section: Discussionmentioning
confidence: 99%
“…(1963), and its solution with an IP model is first given by Pritsker et al (1969). MRO problems, on the other hand, are considered as a multiresource constrained multi-project scheduling problem under uncertain environments (Yuan et al, 2018) .…”
Section: Literature Reviewmentioning
confidence: 99%
“…In our simulation experiments, the deck cycle is set as . 7,16,6,6,8] The first five types support equipment (numbered 1−5) are fixed stations, and their configured numbers are . Among these fixed stations, support equipment No.2 is sharing support equipment, while others are exclusive support equipment.…”
Section: Computational Complexity Analysismentioning
confidence: 99%