2015
DOI: 10.1002/smr.1765
|View full text |Cite
|
Sign up to set email alerts
|

A differential evolution-based model to estimate the software services development effort

Abstract: Accurate estimation of software service development effort is a great challenge both in industry and for academia. The concept of effort is an important and effective parameter in process development and software service management. The reliable estimation of effort helps the project managers to allocate the resources better and manage cost and time so that the project will be finished in the determined time and budget. One of the most popular effort estimation methods is analogy‐based estimation (ABE) to comp… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
5
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(5 citation statements)
references
References 57 publications
(108 reference statements)
0
5
0
Order By: Relevance
“…Therefore, they proposed a hybrid method of fuzzy clustering, ABE, and ANN, and utilized two big, real datasets to evaluate the performance of their proposed method; the results were eventually promising [43]. They also studied the software services development effort estimation in another research, to create an efficient and reliable model by combining the ABE method and the Differential Evolution (DE) algorithm [44]. Benala et al [27] studied the effectiveness of the DE algorithm for optimizing the feature weights of the ABE similarity functions using five mutation strategies.…”
Section: Related Workmentioning
confidence: 99%
“…Therefore, they proposed a hybrid method of fuzzy clustering, ABE, and ANN, and utilized two big, real datasets to evaluate the performance of their proposed method; the results were eventually promising [43]. They also studied the software services development effort estimation in another research, to create an efficient and reliable model by combining the ABE method and the Differential Evolution (DE) algorithm [44]. Benala et al [27] studied the effectiveness of the DE algorithm for optimizing the feature weights of the ABE similarity functions using five mutation strategies.…”
Section: Related Workmentioning
confidence: 99%
“…The accuracy of ABE is not satisfactory, so many studies have tried to increase its accuracy by integrating it with different methods. Combination of ABE and PSO, 44 ABE and ANN, 45 and ABE and differential evolution‐based model 46 are other types of the ABE method. In order to achieve a high‐performance model, some studies have combined several estimation methods using specific selection methods or combination rules to estimate the effort 1,33,47–50 .…”
Section: Related Researchmentioning
confidence: 99%
“…Usually, the task of SCE in companies and programming teams is the responsibility of the project manager, who of course must be an experienced project manager and have previous knowledge in these fields [8]. Estimating resources, cost, and schedule for a software engineering activity depends on things like experience, and access to relevant statistical data.…”
Section: Introductionmentioning
confidence: 99%