2014
DOI: 10.1016/j.ijpe.2013.11.023
|View full text |Cite
|
Sign up to set email alerts
|

A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
34
0
1

Year Published

2016
2016
2021
2021

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 108 publications
(35 citation statements)
references
References 47 publications
0
34
0
1
Order By: Relevance
“…The proposed formulation takes into account the operative expenditures of an established DC due to its practical activity surface instead of the presumption that an established DC functions at the uttermost acumen. Some other related paper can be found in Taleizadeh et al (2008Taleizadeh et al ( , 2009Taleizadeh et al ( , 2010aTaleizadeh et al ( , b, 2011Taleizadeh et al ( , 2012Taleizadeh et al ( , 2013aTaleizadeh et al ( , b, 2014, Taleizadeh and Pentico (2013), Taleizadeh (2014), Taleizadeh and Nematollahi (2014) and Taleizadeh and Pentico (2014).…”
Section: Capacitated Scndmentioning
confidence: 96%
“…The proposed formulation takes into account the operative expenditures of an established DC due to its practical activity surface instead of the presumption that an established DC functions at the uttermost acumen. Some other related paper can be found in Taleizadeh et al (2008Taleizadeh et al ( , 2009Taleizadeh et al ( , 2010aTaleizadeh et al ( , b, 2011Taleizadeh et al ( , 2012Taleizadeh et al ( , 2013aTaleizadeh et al ( , b, 2014, Taleizadeh and Pentico (2013), Taleizadeh (2014), Taleizadeh and Nematollahi (2014) and Taleizadeh and Pentico (2014).…”
Section: Capacitated Scndmentioning
confidence: 96%
“…described an economic production quantity (EPQ) model with random defective items and failure in repair under limited production capacity and shortages. Taleizadeh et al (2014) considered a multi-product single machine economic production quantity (EPQ) model with random defective items and failure in repair under limited production capacity and shortages under backordering. Taleizadeh et al (2013a) developed an imperfect, multi-product production system with rework.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Machining time for each re-workable product (time/unit re-workable product) P 10 Poor quality products produced in regular production phase (%) P 11 Perfect quality products produced in regular production phase (%) P 21 Perfect quality products produced in rework phase (%) P 20 Poor quality products produced in rework phase (%) P 1r…”
Section: Notationmentioning
confidence: 99%
“…They developed a new policy of overlapping and advance receiving in order to prevail good relationship between retailer and supplier. Taleizadeh et al [21] used a simple approach to cycle time and backorder quantity optimization for an imperfect production setup. It was assumed that production was carried out under limited capacity of the manufacturing system.…”
Section: Introductionmentioning
confidence: 99%