2014
DOI: 10.1016/j.cageo.2014.08.006
|View full text |Cite
|
Sign up to set email alerts
|

A data mining approach to finding relationships between reservoir properties and oil production for CHOPS

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
9
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
5
1

Relationship

2
4

Authors

Journals

citations
Cited by 8 publications
(9 citation statements)
references
References 17 publications
0
9
0
Order By: Relevance
“…To analyse the main features of production performance, a polynomial fitting curve of the daily production data that denoted production performance of the well was created. Three production parameters were used to characterize the fitting curve: peak value, effective life cycle and effective yield [3], as shown in Figure 6. The source data of the 118 studied CHOPS wells in the case study were collected and saved in the database [19].…”
Section: Data Collection and Pre-processingmentioning
confidence: 99%
See 4 more Smart Citations
“…To analyse the main features of production performance, a polynomial fitting curve of the daily production data that denoted production performance of the well was created. Three production parameters were used to characterize the fitting curve: peak value, effective life cycle and effective yield [3], as shown in Figure 6. The source data of the 118 studied CHOPS wells in the case study were collected and saved in the database [19].…”
Section: Data Collection and Pre-processingmentioning
confidence: 99%
“…The reservoir property parameters used for association rule mining were six basic petro-physical parameters of a reservoir that can be used to identify to describe characteristics of a reservoir: cumulative porosity, cumulative pore volume, cumulative shale content, cumulative oil saturation, cumulative fluid mobility factor, and effective thickness [3]. To analyse the main features of production performance, a polynomial fitting curve of the daily production data that denoted production performance of the well was created.…”
Section: Data Collection and Pre-processingmentioning
confidence: 99%
See 3 more Smart Citations