SPE Russian Petroleum Technology Conference 2015
DOI: 10.2118/176533-ru
|View full text |Cite
|
Sign up to set email alerts
|

A Cross Link Polymer Sealant for Curing Severe Lost Circulation Events in Fractured Limestone Formations (Russian)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…The polymeric systems can act as loss prevention and sealing agents. Soliman designed an organic cross-link polymer system . Together with plugging materials, severe loss of circulation events can be cured.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The polymeric systems can act as loss prevention and sealing agents. Soliman designed an organic cross-link polymer system . Together with plugging materials, severe loss of circulation events can be cured.…”
Section: Introductionmentioning
confidence: 99%
“…Soliman designed an organic cross-link polymer system. 18 Together with plugging materials, severe loss of circulation events can be cured. High-molecular-weight synthetic polymers used in the gel include polymers or copolymers of acrylamide (AM) monomers, poly(vinyl alcohol), polyacrylonitrile (PAN), etc.…”
Section: Introductionmentioning
confidence: 99%
“…A crosslinked polymer sealant is successfully applied for curing severe loss circulation while drilling in Kuwait across fractured limestone formations. 16 Ziad et al 17 reported the first successful reservoir isolation using exclusively a temporary gel plug that allowed safe and successful execution of a mechanical descaling operation without using CaCO 3 chips for well workover in hightemperature/high-pressure gas wells in Saudi Arabia. In addition, we extended the using of Cr 3+ /salt-tolerant polymer gel for well workover in low-temperature reservoirs and provide an avenue to bridge the design philosophy of well workover and water shutoff.…”
Section: Introductionmentioning
confidence: 99%