2017
DOI: 10.1186/s13677-017-0092-1
|View full text |Cite
|
Sign up to set email alerts
|

A critical survey of live virtual machine migration techniques

Abstract: Virtualization techniques effectively handle the growing demand for computing, storage, and communication resources in large-scale Cloud Data Centers (CDC). It helps to achieve different resource management objectives like load balancing, online system maintenance, proactive fault tolerance, power management, and resource sharing through Virtual Machine (VM) migration. VM migration is a resource-intensive procedure as VM's continuously demand appropriate CPU cycles, cache memory, memory capacity, and communica… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
42
0
1

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 79 publications
(43 citation statements)
references
References 93 publications
0
42
0
1
Order By: Relevance
“…In the second phase, termination depends on the defined threshold. The termination phase is executed if any one of conditions meet [21]: a. Number of iterations exceeds the number of iterations pre-defined, b.…”
Section: Pre-copy Approachmentioning
confidence: 99%
See 1 more Smart Citation
“…In the second phase, termination depends on the defined threshold. The termination phase is executed if any one of conditions meet [21]: a. Number of iterations exceeds the number of iterations pre-defined, b.…”
Section: Pre-copy Approachmentioning
confidence: 99%
“…Choudhary et.al. [21], compares pre-copy with post-copy, seen that the second approach reduces the total migration time and the transferred number of pages. But due to migration latency of fetching the pages it has more downtime than the first approach.…”
Section: Hybrid Technique (Pre and Post Copy)mentioning
confidence: 99%
“…Step 7 : Calculate Cost during migration with (17) Step 8 : Compute Performance before and after migration with (18) and (19) respectively.…”
Section: Algorithm Designmentioning
confidence: 99%
“…The migration process manages the state of resources, i.e., processor, memory, storage and I/O, during the transfer of VM. This includes memory allocated and used by VM, memory requested by application, virtual disk sizes and blocks used by VM [19]. In [13,20] the number of iterations is calculated as the minimum value of threshold point and the maximum number of iterations set for migration.…”
mentioning
confidence: 99%
“…In live virtual machine migration, the internal components such as state of memory and processor registers migrated to target. The external state information such as virtual disk information is accessed through network attached storage (NAS) [8] by physical machines as and when required. All the components of a VM such as network connectivity, storage and memory are entirely moved from the source host to the destination host.…”
Section: Introductionmentioning
confidence: 99%