All Days 2007
DOI: 10.2118/108608-ms
|View full text |Cite
|
Sign up to set email alerts
|

A Cost-Effective and Safe Method for Transportation and Installation of Subsea Structures—The Pencil Buoy Method

Abstract: fax 01-972-952-9435.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The installation of the SPS is difficult because of the complexity of the ocean environment and the heavy weight of the system. At present, the mainstream installation methods for the SPS include the traditional installation methods [1,2], the sheave installation method (SIM) [3][4][5][6][7], the pendulous installation method (PIM) [8][9][10], the pencil buoy method (PBM) [11,12], the heave compensated landing system (HCLS) [13] and the subsea deployment system (SDS) [14].…”
Section: Introductionmentioning
confidence: 99%
“…The installation of the SPS is difficult because of the complexity of the ocean environment and the heavy weight of the system. At present, the mainstream installation methods for the SPS include the traditional installation methods [1,2], the sheave installation method (SIM) [3][4][5][6][7], the pendulous installation method (PIM) [8][9][10], the pencil buoy method (PBM) [11,12], the heave compensated landing system (HCLS) [13] and the subsea deployment system (SDS) [14].…”
Section: Introductionmentioning
confidence: 99%