2019
DOI: 10.1109/access.2018.2889372
|View full text |Cite
|
Sign up to set email alerts
|

A Cooperative Coevolution Algorithm for the <italic>Seru</italic> Production With Minimizing Makespan

Abstract: Seru production can be used to enhance productivity, such as makespan reduction and manpower saving. Seru system operation includes two NP-hard problems, i.e., seru formation and seru scheduling. The exact solution cannot be obtained by solving only one of seru formation and seru scheduling. We develop a cooperative coevolution algorithm for the Seru production with minimizing makespan by solving the seru formation and seru scheduling simultaneously. The cooperative coevolution algorithm includes two evolution… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
9
0
1

Year Published

2019
2019
2022
2022

Publication Types

Select...
7

Relationship

2
5

Authors

Journals

citations
Cited by 26 publications
(10 citation statements)
references
References 34 publications
0
9
0
1
Order By: Relevance
“…Heuristic algorithms usually cannot get satisfactory solutions for large-scale instances. Comparatively, evolutionary algorithms can gain satisfactory solutions in limited time and have been successfully applied to pure seru-system [14][15][16][17][18]. Thus, it motivates us to develop an effective evolutionary algorithm to solve the HSSOP with makespan minimization criterion.…”
Section: Cca For Hssopmentioning
confidence: 99%
See 1 more Smart Citation
“…Heuristic algorithms usually cannot get satisfactory solutions for large-scale instances. Comparatively, evolutionary algorithms can gain satisfactory solutions in limited time and have been successfully applied to pure seru-system [14][15][16][17][18]. Thus, it motivates us to develop an effective evolutionary algorithm to solve the HSSOP with makespan minimization criterion.…”
Section: Cca For Hssopmentioning
confidence: 99%
“…Liu et al [14] designed an algorithm based on NSGA-II to minimize the carbon dioxide emission and makespan. Sun et al [15] developed a cooperative coevolution algorithm by combining GA, local search and ant colony algorithm for the seru production with the minimization of makespan. Yılmaz [16] built a mathematical model for the workforce scheduling problem in seru-system and designed an NSGA-II to minimize the makespan and workload imbalance.…”
Section: Introductionmentioning
confidence: 99%
“…Sun vd. [24] tarafından yapılan çalışma da iki problemi birlikte ele almaktadır. Yazarlar çalışmalarında iki problem tipinin başlı başına NPzor problem tipi olduğunu söyledikten sonra dikkate alınan problemlerin tek başına çözülmelerinin, seru sistemini uygulayan işletme için kesin bir çözüm sağlamayacağını belirtmişlerdir.…”
Section: Li̇teratür Araştirmasi (Literature Review)unclassified
“…Lian et al (2018) [21] considered a multi-skilled worker assignment problem with worker heterogeneity in seru systems. Sun et al (2019) [41] developed a cooperative coevolution algorithm which combining generic algorithm and local search, and the ant colony optimization algorithm for solving seru formulation and seru scheduling problem at the same time with the objective of minimizing makespan. Sun et al (2019) [42] used a cooperative coevolution algorithm to solve seru production problem aim at reducing the total tardiness.…”
mentioning
confidence: 99%
“…Sun et al (2019) [41] developed a cooperative coevolution algorithm which combining generic algorithm and local search, and the ant colony optimization algorithm for solving seru formulation and seru scheduling problem at the same time with the objective of minimizing makespan. Sun et al (2019) [42] used a cooperative coevolution algorithm to solve seru production problem aim at reducing the total tardiness. Although the researches above took worker assignment into account, few researches has considered the hierarchy of worker assignment decision and production allocation decision.…”
mentioning
confidence: 99%