2021
DOI: 10.1088/1748-0221/16/08/t08001
|View full text |Cite
|
Sign up to set email alerts
|

A container-based facility for testing 20'000 20-inch PMTs for JUNO

Abstract: The main goal of the JUNO experiment is the determination of the neutrino mass ordering. To achieve this, an extraordinary energy resolution of at least 3 % at 1 MeV is required for which all parts of the JUNO detector need to meet certain quality criteria. This is relevant in particular for those which are related to the energy resolution of the detector, such as the photomultiplier tubes (PMTs) to be deployed in JUNO. This paper presents the setup and performance of a dedicated PMT mass testing facility to e… Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
13
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(14 citation statements)
references
References 27 publications
(34 reference statements)
1
13
0
Order By: Relevance
“…3 with G the measured gain, which is consistent with the applied fitting function used for dynode PMTs in the selected range [28]. Additional information about the HV determination can be found in [68]. A discussion about different methods for the gain determination and their effects can be found also in separate papers [24,81,82].…”
Section: Gain and Hv Determinationsupporting
confidence: 64%
See 4 more Smart Citations
“…3 with G the measured gain, which is consistent with the applied fitting function used for dynode PMTs in the selected range [28]. Additional information about the HV determination can be found in [68]. A discussion about different methods for the gain determination and their effects can be found also in separate papers [24,81,82].…”
Section: Gain and Hv Determinationsupporting
confidence: 64%
“…The containers achieve a stable performance over time as well as a sufficient accuracy of e.g. ≤ 1 % for the absolute PDE and ≤ 1 ns for the timing parameters such as the TTS (only container #B) [68] -this will be discussed also in secs.4.4 and 4.6. Hence, the system can provide reliable and comparable results for all available 20-inch PMTs characterized in this PMT testing campaign.…”
Section: Pmt Mass Testing: Container Systemsmentioning
confidence: 98%
See 3 more Smart Citations