A Comprehensive and Practical Framework for Reliable Scheduling in Project Management

Abstract: Schedule reliability is essential to successfully achieve EPC (engineering, procurement and constriction) project objectives. Several studies in the past were based on traditional risk management technique which has its own limitations that lack one to obtain a reliable project schedule. To overcome these limitations a comprehensive framework is developed based on the integration of risk management and Critical Chain Project Management (CCPM) that can give a much reliable project scheduling. In the proposed fr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2015
2015
2020
2020

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 16 publications
0
3
0
Order By: Relevance
“…According to the scientific literature review carried out in this research for the period 1996-2019, the solution techniques most frequently used to solve the RCPSP with random duration of activities were the Genetic Algorithms [5][6][7][8][9][10][11][12][13][14][15][16] and the Critical Chain Method [17][18][19][20][21][22][23][24][25][26][27][28]. The RCPSP with random duration of activities and stochastic tasks insertion was presented by [29].…”
Section: Resource Constrained Project Scheduling Problem With Random mentioning
confidence: 99%
“…According to the scientific literature review carried out in this research for the period 1996-2019, the solution techniques most frequently used to solve the RCPSP with random duration of activities were the Genetic Algorithms [5][6][7][8][9][10][11][12][13][14][15][16] and the Critical Chain Method [17][18][19][20][21][22][23][24][25][26][27][28]. The RCPSP with random duration of activities and stochastic tasks insertion was presented by [29].…”
Section: Resource Constrained Project Scheduling Problem With Random mentioning
confidence: 99%
“…On the other hand, Mansoorzadeh, Yusof, Mansoorzadeh, and Zeynal [34] proposed a framework based on the integration of risk management and Critical…”
Section: B Proactive Strategy To Solve the Psp With Random Duration Of Activitiesmentioning
confidence: 99%
“…Their objectives have been to find an optimum solution for resource allocation, rescheduling, buffer insertion and project duration in CCPM. Another aspect is to improve CCPM reliability via combining it with the existing risk management techniques (Steyn, 2002;Mansoorzadeh and Yusof, 2011;Mansoorzadeh et al, 2014;Thipparate, 2014). One last aspect considered by improving studies has been identification of CCPM success factors by Repp and Wright (2013) and Simpson and Lynch (1999).…”
Section: Other Improvementsmentioning
confidence: 99%