2012
DOI: 10.1016/j.ejor.2012.01.031
|View full text |Cite
|
Sign up to set email alerts
|

A comparison of three metaheuristics for the workover rig routing problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
21
0

Year Published

2012
2012
2019
2019

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 32 publications
(21 citation statements)
references
References 19 publications
0
21
0
Order By: Relevance
“…While the OMM uses the variables S imt and S jmh in constraints (3) and (4), the RMM and the DMM do not use the index j of the formulation and use the variable S imh in constraint (20) and the variable S ih in constraint (24), that is, they use fewer constraints. The same number of variables is used in the OMM and the RMM, and fewer are used in the DMM compared to them because it is a mathematical model that does not consider the problem of allocating wells to rigs.…”
Section: Comparison Between the Omm The Rmm And The Dmmmentioning
confidence: 99%
See 1 more Smart Citation
“…While the OMM uses the variables S imt and S jmh in constraints (3) and (4), the RMM and the DMM do not use the index j of the formulation and use the variable S imh in constraint (20) and the variable S ih in constraint (24), that is, they use fewer constraints. The same number of variables is used in the OMM and the RMM, and fewer are used in the DMM compared to them because it is a mathematical model that does not consider the problem of allocating wells to rigs.…”
Section: Comparison Between the Omm The Rmm And The Dmmmentioning
confidence: 99%
“…Constraint (23) ensures that the start of the intervention in each well occurs only once by a rig at a specific time. Constraint (24) ensures that a maximum of N interventions are performed at a specific time and that there is no interference between the allocations of the wells to rigs. Constraint (25) defines the domain of the decision variables and ensures that the start of the interventions in the wells is within the time window.…”
Section: Decomposed Mathematical Modelmentioning
confidence: 99%
“…Aloise et al 4 proposed a variable neighborhood search heuristic and tested it on real-world cases in Brazil. Ribeiro et al 11 proposed the clustering search and adaptive large neighborhood search heuristics using instances generated by Neves. 12 Ribeiro et al 13 proposed a mathematical model and a branch-price-and-cut algorithm and generated a group of random instances.…”
Section: Introductionmentioning
confidence: 99%
“…Ribeiro et al [33] present a CS to the workover rig routing problem that is a variant of the vehicle routing problem with time windows. The objective is to minimize the total lost production in the operations of onshore oil fields.…”
Section: Cs Related Applicationsmentioning
confidence: 99%