2016
DOI: 10.1080/19375247.2016.1255426
|View full text |Cite
|
Sign up to set email alerts
|

A comparison of quality management for bored pile/drilled shaft (BP/DS) foundation construction and the implementation of recent technologies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Design and construction processes involve tools and techniques for ensuring the quality of materials and workmanship during the construction process, thus providing QA. The techniques used in QM include visual inspection from the top of the excavation, downhole camera, shaft inspection device, and base grouting [4]. QC is defined as the verification of foundation integrity and capacity, and it utilises technologies for flaws location in material and load tests [5].…”
Section: Introductionmentioning
confidence: 99%
“…Design and construction processes involve tools and techniques for ensuring the quality of materials and workmanship during the construction process, thus providing QA. The techniques used in QM include visual inspection from the top of the excavation, downhole camera, shaft inspection device, and base grouting [4]. QC is defined as the verification of foundation integrity and capacity, and it utilises technologies for flaws location in material and load tests [5].…”
Section: Introductionmentioning
confidence: 99%