2020
DOI: 10.1007/s11831-020-09456-8
|View full text |Cite
|
Sign up to set email alerts
|

A Comparative Study of Recent Optimization Methods for Optimal Sizing of a Green Hybrid Traction Power Supply Substation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 93 publications
0
3
0
Order By: Relevance
“…Kashani et al [13] evaluated the uses of PSO on geo-specialized issues and finally offered a comparative study solving three geotechnical engineering problems using the PSO variants. Foroutan et al [14] Fig. 1 Percentage of different DE variants developed using various strategies…”
Section: Few Work On Verification Of Performance and Real-world Probl...mentioning
confidence: 99%
“…Kashani et al [13] evaluated the uses of PSO on geo-specialized issues and finally offered a comparative study solving three geotechnical engineering problems using the PSO variants. Foroutan et al [14] Fig. 1 Percentage of different DE variants developed using various strategies…”
Section: Few Work On Verification Of Performance and Real-world Probl...mentioning
confidence: 99%
“…The power flow of the supercapacitor, accumulator and electric locomotive is realized by a bidirectional DC/DC converter and the regenerative braking energy is absorbed at different power levels. In [25], a vehicle-mounted hybrid energy storage system and its energy management method are presented. A high-capacity and high-power supercapacitor hybrid energy storage system with lithium titanate battery placed on an electric locomotive is designed.…”
Section: Vehicle-mounted Energy Storagementioning
confidence: 99%
“…How to ensure that the substation not only has sufficient capacity to consume new energy, but also can provide high-quality power supply for regional economic and social development and people's living standards, is the main task of substation construction [1]. The construction of PSP can promote regional new energy consumption and improve living standards, which has a significant role in promoting the development of new energy [2]. However, with more and more PSP, the problem faced by project managers is how to evaluate and predict the implementation effect of a PSP, so as to timely and effectively judge whether the construction and operation effect can reach the expectation.…”
Section: Introductionmentioning
confidence: 99%