2013
DOI: 10.1080/13669877.2013.815653
|View full text |Cite
|
Sign up to set email alerts
|

A combined approach for supply chain risk management: description and application to a real hospital pharmaceutical case study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
39
0
2

Year Published

2015
2015
2023
2023

Publication Types

Select...
4
2
2

Relationship

0
8

Authors

Journals

citations
Cited by 55 publications
(42 citation statements)
references
References 43 publications
1
39
0
2
Order By: Relevance
“…Quantitative frameworks have utilised hybrid methods to assess and manage risks. For example, Elleuch et al (2014) combined FMEA, design of experiments, discrete event simulation, Analytical…”
Section: Supply Chain Risk Management Process/frameworkmentioning
confidence: 99%
“…Quantitative frameworks have utilised hybrid methods to assess and manage risks. For example, Elleuch et al (2014) combined FMEA, design of experiments, discrete event simulation, Analytical…”
Section: Supply Chain Risk Management Process/frameworkmentioning
confidence: 99%
“…The costs in talent cultivation are relatively high for pharmaceutical factories, and high turnover rate has been the most annoying problem of human resource management in these organizations. Improper turnover rate could affect the quality of customer services and result in temporary shortage of experience inheritance (Elleuch et al 2014).…”
Section: Introductionmentioning
confidence: 99%
“…In the literature, the SCRM process is described in similar ways, which can vary from risk identification and/or measurement, risk assessment and/or risk evaluation to mitigation plans and control and/or monitoring (Hallikas et al, 2002;Neiger et al, 2003;Jüttner et al 2005;Kleindorfer and Saad 2005;Tse et al, 2005;Cucchiella and Gastaldi, 2006;Ritchie and Brindley, 2007;Adhitya et al, 2008;Knemeyer et al, 2009;Giannakis and Louis, 2011;Tummala and Schoenherr, 2011;Kern et al, 2012;Ghadge et al, 2013;Ceryno et al, 2014;Elleuch et al, 2014). Different systems have been put forward but most approaches for SCRM process tend to follow the generic process shown in Figure 4.…”
Section: Supply Chain Risk Management (Scrm)mentioning
confidence: 99%
“…Risk assessment is the second step for SCRM, which focuses on the prioritization of the risks that will affect the vulnerability of the SC, as consequence contributes with the selection process of suitable corrective management actions for the identified risk in the Risk Identification phase Hallikas et al, 2004;Norrman and Jansson, 2004;Adhitya et al, 2008;Oehnen et al, 2009;Giannakis and Louis, 2011;Blome and Schoenherr, 2011;Tummala and Schoenherr, 2011;Elleuch et al, 2014). Many authors define risk assessment as the determination of the likelihood of occurrence and severity level for each risk identified (Hallikas et al, 2002;Hallikas et al, 2002;Norrman and Jansson, 2004;Kleindorfer and Saad, 2005;Ritchie and Brindley, 2007;Adhitya et al, 2008;Manuj and Mentzer, 2008;Oehnen et al, 2009;Tuncel and Alpan, 2010;Blome and Schoenherr, 2011;Giannakis and Louis, 2011;Tummala and Schoenherr, 2011;Kern et al, 2012;Ghadge et al, 2013).…”
Section: Supply Chain Risk Management (Scrm)mentioning
confidence: 99%
See 1 more Smart Citation