All Days 2015
DOI: 10.2118/176257-ms
|View full text |Cite
|
Sign up to set email alerts
|

A Case Study: Validation of Real Time Non-Isothermal Hydraulic Model Using Deepwater Managed Pressure Drilling Data

Abstract: Drilling through narrow window between pore and fracture pressure using Managed Pressure Drilling (MPD) approach requires precise hydraulic designs and pressure control plans to achieve drilling to target depth safely in timely manner which require accurate hydraulic model on pressure changes behavior along the borehole.This paper presents a case study where a non-isothermal hydraulic model was validated using field data from successful Deepwater MPD well in Offshore East Kalimantan, Indonesia. The validation … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 21 publications
0
0
0
Order By: Relevance