2021
DOI: 10.1155/2021/5510566
|View full text |Cite
|
Sign up to set email alerts
|

A Case Study on the Gas Drainage Optimization Based on the Effective Borehole Spacing in Sima Coal Mine

Abstract: Based on the dynamic expressions of permeability and porosity of the coal seam derived in the paper, a multiphysical field coupling numerical model of gas migration under the interaction of stress field and seepage field was established. The gas drainage project #3 Coal Seam operated by Sima Coal Industry Co., Ltd., was selected as the study object. Taking different drainage time periods in various positions of drainage holes into consideration, combined with the advance situation of the 1207 working face in t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 14 publications
(16 reference statements)
0
1
0
Order By: Relevance
“…(1) Reasonable Borehole Spacing in a Fully Pressure-Relief Zone. To determine reasonable borehole spacing in the fully pressure-relief zone (see Figure 10), according to the literature [24], five cases of gas extraction with borehole spacing being 20 m, 25 m, 30 m, 35 m, and 40 m are simulated, respectively. The gas pressure-time curves for monitoring point under varying borehole spacings are given in Figure 20.…”
Section: Reasonable Borehole Spacing In Different Pressure Relief Zonesmentioning
confidence: 99%
“…(1) Reasonable Borehole Spacing in a Fully Pressure-Relief Zone. To determine reasonable borehole spacing in the fully pressure-relief zone (see Figure 10), according to the literature [24], five cases of gas extraction with borehole spacing being 20 m, 25 m, 30 m, 35 m, and 40 m are simulated, respectively. The gas pressure-time curves for monitoring point under varying borehole spacings are given in Figure 20.…”
Section: Reasonable Borehole Spacing In Different Pressure Relief Zonesmentioning
confidence: 99%