International Conference on Intelligent Manufacturing and Industrial Automation (CIMIA 2022) 2022
DOI: 10.1117/12.2640895
|View full text |Cite
|
Sign up to set email alerts
|

A building block inspired algorithm with variable neighborhood search for no-wait flow shop scheduling problems

Abstract: The no-wait flow shop scheduling problem (NWFSP) has been achieved a wide variety of researches by scholars as a typical NP-hard problem. In this paper, a construction block inspired variable neighborhood search heuristic algorithm (BBA-VNS) is proposed for solving NWFSP with the goal of maximum completion time. The core idea of BBA is to seek out the best match until all jobs are arranged in the process set. In the BBA, waiting time matrix and matching matrix between two jobs are constructed to obtain an appr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 11 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?