2022
DOI: 10.1061/(asce)is.1943-555x.0000663
|View full text |Cite
|
Sign up to set email alerts
|

A Bootstrap-Based Integer Programming Algorithm for Budget Allocation in Pavement Management Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 23 publications
0
2
0
Order By: Relevance
“…The area between the improved condition curve and the condition deterioration curve (no treatment) in Fig 1 is defined as the condition improvement area. M&R benefit of segment j, B j , is calculated as the product of Annual Average Daily Traffic (AADT), segment length and condition improvement area using Eq (6). To enhance the investment return, the maximization of the total M&R benefit is defined as the second objective as presented in Eq (2).…”
Section: Decision-making Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…The area between the improved condition curve and the condition deterioration curve (no treatment) in Fig 1 is defined as the condition improvement area. M&R benefit of segment j, B j , is calculated as the product of Annual Average Daily Traffic (AADT), segment length and condition improvement area using Eq (6). To enhance the investment return, the maximization of the total M&R benefit is defined as the second objective as presented in Eq (2).…”
Section: Decision-making Modelmentioning
confidence: 99%
“…A high annual budget may not be efficient considering the strained finances; and a low annual budget causes the delays on M&R treatments, which contributes to the accumulation of yearly M&R backlogs and accelerates the road deterioration [ 4 , 5 ]. According to Abukhalil and Smadi, the scarcity of funding on M&R backlog had increased from $549.5 billion in 2009 to $836 billion in 2017 [ 6 ]. Therefore, an appropriate annual budget should be sufficient to allow “the right treatment on the right pavement at the right time” [ 7 ] and result in the highest investment return.…”
Section: Introductionmentioning
confidence: 99%