A bi-layer optimization approach for a hybrid flow shop scheduling problem involving controllable processing times in the steelmaking industry

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 62 publications
(12 citation statements)
references
References 33 publications
(39 reference statements)
0
12
0
Order By: Relevance
“…Some studies already consider the casting time in the machine not only as a decision variable that allows to optimize the process. 26) In case of having an algorithm that provides the ideal schedule, it is not only necessary that it adapts to the different levels of severity of unforeseen events, but also that it knows how to discern the ideal solutions at the time of the event. 66) Any change in the temperature route during the whole process can be taken into account as a contingence, as long as it can be needed more time to accomplished some stage.…”
Section: Contingenciesmentioning
confidence: 99%
“…Some studies already consider the casting time in the machine not only as a decision variable that allows to optimize the process. 26) In case of having an algorithm that provides the ideal schedule, it is not only necessary that it adapts to the different levels of severity of unforeseen events, but also that it knows how to discern the ideal solutions at the time of the event. 66) Any change in the temperature route during the whole process can be taken into account as a contingence, as long as it can be needed more time to accomplished some stage.…”
Section: Contingenciesmentioning
confidence: 99%
“…To ensure that the rolled coil quality remains acceptable, we should replace working rollers after rolling a certain number of slabs. In the real world, a scheduling problem in the steel industry is a complex problem; therefore, a wide variety of approaches have been applied to solve it: a hybrid differential evolution algorithm is proposed by Jiang et al 21 Pan and Yang formulated this problem as a multiple route problem with multiple objectives. The procedure for solving this problem is based on a partial set-partitioning formulation; 22 a heuristic rescheduling algorithm is proposed that has the minimum total waiting time, 23 and a two-stage scheduling method is proposed for solving the hot rolling scheduling problem.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Thus, welding scheduling problem (WSP) plays an important role in promoting an enterprise to be a manufacturing giant. However, studies on the WSP are relatively scarce in comparison with other real-world scheduling problems such as steelmaking scheduling issues [2][3][4][5][6][7][8][9] . The main reasons for few researches on the real-world WSP may be the following aspects.…”
Section: Introductionmentioning