2021
DOI: 10.3934/jimo.2020054
|View full text |Cite
|
Sign up to set email alerts
|

A better dominance relation and heuristics for Two-Machine No-Wait Flowshops with Maximum Lateness Performance Measure

Abstract: In this paper, we consider a manufacturing system with twomachine no-wait flowshop scheduling problem where setup times are uncertain. The problem with the performance measure of maximum lateness was addressed in the literature (Computational and Applied Mathematics 37, 6774-6794) where dominance relations were proposed. We establish a new dominance relation and show that the new dominance relation is, on average, about 90% more efficient than the existing ones. Moreover, since it is highly unlikely to find op… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 27 publications
0
1
0
Order By: Relevance
“…No-wait flowshops are applicable in industries such as pharmaceutical, chemical, and plastic [4]. In the literature, although some work has been conducted for no-wait flowshops with uncertain data, e.g., [5,10,11] for the twomachine case, the analysis conducted in this paper can be extended to no-wait flowshops with four machines.…”
Section: Discussionmentioning
confidence: 99%
“…No-wait flowshops are applicable in industries such as pharmaceutical, chemical, and plastic [4]. In the literature, although some work has been conducted for no-wait flowshops with uncertain data, e.g., [5,10,11] for the twomachine case, the analysis conducted in this paper can be extended to no-wait flowshops with four machines.…”
Section: Discussionmentioning
confidence: 99%