A Benders decomposition approach to transmission expansion planning considering energy storage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
18
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 39 publications
(20 citation statements)
references
References 55 publications
0
18
0
Order By: Relevance
“…For this reason, an ESS is often considered as a substitute or support for the transmission lines. Hu et al [131] showed that deploying ESS can reduce transmission grid investment costs and MacRae et al [133] demonstrated that an ESS can be used to postpone investments in transmission system. Aguado et al [137] showed that the net social welfare increases when ESS are included in transmission expansion planning.…”
Section: Coordinated Investments In Ess and Transmission System Assetsmentioning
confidence: 99%
See 1 more Smart Citation
“…For this reason, an ESS is often considered as a substitute or support for the transmission lines. Hu et al [131] showed that deploying ESS can reduce transmission grid investment costs and MacRae et al [133] demonstrated that an ESS can be used to postpone investments in transmission system. Aguado et al [137] showed that the net social welfare increases when ESS are included in transmission expansion planning.…”
Section: Coordinated Investments In Ess and Transmission System Assetsmentioning
confidence: 99%
“…Planning Solving Technique [20,22,23,30,43,46,[49][50][51]53,54,57,59,73,74,78,[88][89][90]105] [ 119,125,130,156] LP [1,16-18,20,25,32,33,35,44,47,50,52, 56-58,60,61,63,65,66,70-72,76,79-83, 86,92,94-96,100-102,104,106,107] [ 14,28,[109][110][111][112][113][114][115]117,121,122,126,127,131,[133][134][135][136][137]139,148,149,155,156,<...>…”
Section: Operationmentioning
confidence: 99%
“…Each decision-maker can set the optimality gaps precisely. These pro ts lead to the utilization of the BDA in various contexts such as APP [7], planning of energy [74], SCND [75], and scheduling [76].…”
Section: Solution Approach 41 Introducing the Benders Decompositionmentioning
confidence: 99%
“…System parameters are available in the literature [9]. Suppose that all the load and power capacity of the system are increased to 3 times of the original value, and the maximum total load is increased to 8550MW.…”
Section: Example System Settingsmentioning
confidence: 99%
“…This paper takes the IEEE 24 bus system as an example system [9]. System parameters are available in the literature [9].…”
Section: Example System Settingsmentioning
confidence: 99%