1995
DOI: 10.2172/63939
|View full text |Cite
|
Sign up to set email alerts
|

60-day safety screen results for tank 241-BY-106, rotary mode, cores 64 and 65

Abstract: Appro&-2. Approved wlcomment 4. Reviewed nolcomment 6. Reviewed wlcomment 3. hfomutfon 8. Dist. (M p t A c h w. Requiredl 3. Dilappmwd wlcomment 6. Receipt acknowledged l e Approval ~ 4. Review 2, ROk.80 6. Port-ROV#w I1 Approved w/ccmnents 11 Disapproved u/comaents ka&5 Date AuthorizedRepm~entatiw Date Cognizant Managor 3riginator for Rboaiving Organization 80.7400.172-1 I RELEASE AUTH ORlZATlON

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
11
0

Year Published

1995
1995
1996
1996

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(11 citation statements)
references
References 0 publications
0
11
0
Order By: Relevance
“…Analytical results required by the BY-I06 TCP have been performed and reported in Bell (1996aBell ( , 1995aBell ( , 1995b. The raw data not previously reported is provided in this data package and additional analyses performed but not previously reported are reported here.…”
Section: Analytical Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…Analytical results required by the BY-I06 TCP have been performed and reported in Bell (1996aBell ( , 1995aBell ( , 1995b. The raw data not previously reported is provided in this data package and additional analyses performed but not previously reported are reported here.…”
Section: Analytical Resultsmentioning
confidence: 99%
“…Copies of these reports are included as Attachment 2. A narrative describing the results of each extrusion is available in Bell (1995a) and Bell (1996a).…”
Section: Sample Receipt and Extrusionmentioning
confidence: 99%
See 2 more Smart Citations
“…Analytical results for the small amount of sludge ( -5 cm) recovered from tank 241-BY-106 were published this quarter (Bell 1995) and are summarized in Table 3-1. Three DSC analyses on the sludge material measured 670, 1,400, and 670 Jig on a dry basis.…”
Section: -9mentioning
confidence: 99%